 |

Click on thumbnail for full size image.
|
 |
Engineer: |
Raudenbush Engineering,
Inc. |
|
 |
Contractor: |
Pflumm Construction, Inc. |
|
 |
Construction
Cost: |
$136,000 |
|
 |
Project
Description: |
Precast Concrete (Post-tensioned) Bridge,
3-sided Open-bottom, Cast-in-Place Wing Walls, 20-foot
Span with 10-foot Clearance. |
|
 |
|